Hybrid PQC Migration
Introduce quantum-safe primitives alongside classical cryptography while preserving interoperability and operational confidence.
What this capability solves
Immediate classical-only retirement may be impractical. Hybrid migration allows organizations to gain PQC protection while retaining established classical assurances during transition.
Technology is implemented as an operating capability: architecture, integration, governance, assurance, people, procedures and measurable outcomes are designed together.
Capability model
Modular building blocks allow the scope to start with a focused pilot and expand into an enterprise operating model.
Hybrid Key Establishment
Combine classical and PQC key establishment according to approved platform capabilities.
Hybrid Authentication / Signatures
Evaluate dual-signature or transition trust patterns where appropriate.
Compatibility Testing
Test clients, servers, proxies, libraries, HSMs and network middleboxes.
Performance Engineering
Measure handshake size, CPU, memory, latency and constrained-device impact.
Fallback Governance
Define when fallback is allowed, detected, logged and retired.
Wave Migration
Pilot, expand, rekey and remove classical-only paths based on risk.
How the capability fits together
Final topology, control placement and deployment model are validated during discovery and detailed design.
Controls & governance
- Approved cryptographic profile registry
- Hybrid-first transition where compatibility requires it
- No untested algorithm replacement in production
- Key/certificate lifecycle and fallback controls
- Vendor and firmware dependency tracking
- Independent test evidence for critical systems
- Exception ownership and retirement dates
Priority use cases
- TLS/API
- VPN
- SSH
- Service mesh
- Internal PKI
- High-value applications
Key deliverables
- Hybrid design profiles
- Compatibility matrix
- Pilot implementation
- Performance results
- Fallback controls
- Migration wave plan
Integration considerations
- CMDB/asset inventory
- PKI/HSM/KMS
- Network/security platforms
- Application/CI-CD dependencies
- Cloud and SaaS configuration
- IoT/OT device inventory
- GRC/remediation workflow
Phased delivery
Each phase ends with evidence, acceptance criteria and a decision gate before broader scale-out.
