IoT / OT PQC Migration
Plan quantum-safe transition for constrained, safety-sensitive and long-lived device environments without disrupting operations.
What this capability solves
IoT/OT systems can remain deployed for a decade or more, often with fixed cryptography and vendor-controlled firmware. Migration requires hardware, performance, safety and fleet lifecycle considerations.
Technology is implemented as an operating capability: architecture, integration, governance, assurance, people, procedures and measurable outcomes are designed together.
Capability model
Modular building blocks allow the scope to start with a focused pilot and expand into an enterprise operating model.
Device Segmentation
Group hardware classes by CPU/memory, lifecycle, connectivity and criticality.
Firmware / Crypto Inventory
Libraries, boot/signing, device identity, transport and update cryptography.
Hardware Readiness
Assess secure elements, TPM/TEE, memory/CPU and upgrade constraints.
Hybrid Device Trust
Pilot PQC-ready identity and key establishment with safe fallback.
OTA / Signing
Modernize update signing, A/B deployment and anti-rollback.
Fleet Governance
Track supported profiles, exceptions, patch state and replacement requirements.
How the capability fits together
Final topology, control placement and deployment model are validated during discovery and detailed design.
Controls & governance
- Approved cryptographic profile registry
- Hybrid-first transition where compatibility requires it
- No untested algorithm replacement in production
- Key/certificate lifecycle and fallback controls
- Vendor and firmware dependency tracking
- Independent test evidence for critical systems
- Exception ownership and retirement dates
Priority use cases
- Industrial IoT
- Smart infrastructure
- Remote sensors
- Fleet/telematics
- Medical/regulated devices
Key deliverables
- Device class inventory
- Crypto/firmware map
- Hardware readiness matrix
- Pilot profile
- OTA trust design
- Fleet migration roadmap
Integration considerations
- IoT device management
- OT asset inventory
- Private networks
- PKI/KMS/HSM
- Firmware build/signing
- IntegraQOS
Phased delivery
Each phase ends with evidence, acceptance criteria and a decision gate before broader scale-out.
